Implementation of this project will result in:
- Completion of the set of documents required for tendering of works for the betterment/reconstruction/construction of the SEETO route 2a, represented by arterial/main roads M5 and M16, on sections Banja Luka – Ugar (IEBL) – Lašva.
The outputs arising from this result shall include, but would not necessarily be limited to:
- Review on compliance of the conceptual design with the relevant legislation and spatial plans of RS and FBiH,
- Optimisation of alignment laid down in the phase of the conceptual design, including introduction of connections to the adjacent roads, and relocation of colliding road sections and buildings,
- Prepared preliminary design for betterment, based on the conceptual design,
- Prepared extract of documents for obtaining of the spatial conditions, and ultimately the spatial conformity for betterment / reconstruction / construction interventions,
- Prepared feasibility study,
- Prepared environment impact assessment,
- Prepared road safety audit report,
- Prepared main design for betterment / reconstruction / construction interventions, including interchanges, connections to the adjacent roads, and relocation of colliding road sections and buildings,
- Revised main design by the contractor authorized for revision under the Law of FBiH ,
- Prepared tender dossier for construction of the respective betterment interventions, interchanges, connections to the adjacent roads, and relocation of colliding road sections.