Conceptual design and preliminary studies for railway on South East Europe Transport Observatory Route 9a, Tuzla – Zvornik

Project details
Sectors Transport
EU Acquis Chapters Trans-European networks
EU funds 478 400 €
Implementation period 2021 - 2024
Categories
  •  Civil society;
  •  Climate action

(Mouse hover to see significance)

Summary
The overall objective of the project s acceleration of activities on rehabilitation of the priority sections on the Indicative extension of the TEN-T Rail Comprehensive Network to the Western Balkans (former SEETO Railway Comprehensive Network). This assignment concerns preparation of conceptual designs/preliminary solutions and related preliminary studies for overhaul, reconstruction and construction of railway sections on the TEN-T extension/SEETO Comprehensive Network railway Route 9a: Tuzla - Zvornik and Tuzla - Tuzla International Airport.
Results
The assignment shall provide for the following results: 1. Railway section (Bosanska Poljana) - Tuzla - Zvornik: - Preliminary solutions / conceptual designs for overhauling / reconstruction / construction of the railway section, - Preliminary studies for overhauling / reconstruction / construction of the railway section, and - Preparation of technical guidelines and specifications needed for compilation of tender dossier for preparation of preliminary and main design and related studies for construction of overhaul / reconstruction / construction interventions. 2. Railway section Tuzla – Tuzla international Airport: - Preliminary solutions / conceptual designs for overhauling / reconstruction / construction of the railway section, - Preliminary studies for overhauling / reconstruction / construction of the railway section, and - Preparation of technical guidelines and specifications needed for compilation of tender dossier for preparation of preliminary and main design and related studies for construction of overhaul / reconstruction / construction interventions.
Locations

Government level color legend

  • Fully funded project on only one level/location:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
  • Partially funded project on multiple levels/locations:
  • STATE
  • ENTITIES AND BRCKO DISTRICT
  • CANTONS
  • MUNICIPALITIES
Project is implemented at municipality level in:
Media